The QC system — trusting your numbers
Quality control is how you earn the right to use your assay numbers — in a resource estimate, a press release, or just a drill-hole decision. The idea is old and simple: slip known quantities in among your samples, and check what the lab says about them.
The three checks
- Standards — pulps with certified element values. If the lab reports a standard well outside its certified range, every number on that certificate deserves suspicion.
- Blanks — barren material. Any real grade in a blank means contamination or sample-swap somewhere between the splitter and the instrument.
- Duplicates — splits of the same material submitted twice. They measure repeatability; wildly different pairs point at nugget effect or lab precision problems.
The lab never knows which samples are the tests — that's the whole point.
Where verdicts live: the QC pages
geoDB judges these automatically, certificate by certificate, on your project's QC pages — charts of standard performance against certified limits, blank results over time, duplicate scatter, and a verdict per certificate. When something fails, the failure is visible and attributable: this certificate, this standard, this much out.
One habit worth building: the QC pages are the one place QC verdicts come from. Ad-hoc checks in a spreadsheet — or a quick statistical look you ask Petra for — are fine for exploring, but the verdict of record is the QC page, and Petra will point you there rather than re-derive one.
Getting QC data in
Nothing extra to do on the way in: QC samples arrive with your ordinary imports. When a certificate lands, geoDB recognises standards, blanks and duplicates (from your sample naming and the reference-standards library), attaches them to the certificate, and the verdict pages update. Your project can pre-select which certified reference materials it uses, so loggers pick from a short list instead of the whole catalogue.
How often QC samples go in — every N samples, and which types — is set separately, in a QC insertion protocol. A project can hold several (an RC campaign and a soils grid want different rates), with one marked as the default.